The Salt Lake Tribune

Location: West Valley City, UT
Market: Office
Industrial
Owner Type: Commercial
Other Tags:
The Salt Lake Tribune project located in West Valley City, Utah earned an Excellence in Concrete award from Intermountain Chapter of the American Concrete Institute (ACI).

Speight Marshall Francis served as Structural Engineer of Record for this new 330,000 square foot multi-story newspaper production/warehouse/office facility with an approximate building cost of $33 million. Total project cost was over $100 million.  First floor area is 220,000 square feet; 2nd floor area is 120,000 square feet; 3rd floor mechanical penthouse is 20,000 square feet.  An elevated concrete structure was designed to support approximately $35 million in printing press equipment.  The press hall, designed for heavy floor loadings, is high-bay with 50-60’ clear spans. Included in scope was design for 5 and 50-ton bridge cranes.

The project is located in a high seismic zone (SDC-D) that required seismic specific detail and building drift control. The building was also designed to an increased Importance Factor due to an owner requirement.  Final design utilized SidePlateTM connection design technology to increase connection stiffness, reduce building drift, reduce in field weld inspections and provided a steel saving to the owner of over $500,000.

Project was awarded a 2006 “Excellence in Concrete” award from the Intermountain Chapter of the American Concrete Institute (ACI).

Image courtesy of Dario Designs.

Architect: Dario Designs
General Contractor: Layton Construction